72 Hour Turnaround for Major Project Specific Hire Equipment Modifications

A Hiretech client required to deploy 350ft of 2” Black Eagle hose in a Zone 2 drill floor area for a wellhead workover. The footprint area and head room were both restricted and the requirement was urgent.
Hiretech rolled a new drum core and fitted it to an existing Zone 2 reel to accommodate the deployment specifications of the Black Eagle hose. The equipment was turned around in 3 days.
The mobilisation was completed in 72 hours allowing the client to meet their time critical schedule.