Well P&A Support
A Hiretech client required the hire of two Zone 1 electric hydraulic power units (HPUs) to support a well plugging and abandonment work scope.
A Hiretech client required the hire of two Zone 1 electric hydraulic power units (HPUs) to support a well plugging and abandonment work scope.
Hiretech recently provided a client with a Zone 2 Well Service pump for a 4 month hire in North Africa.
A Hiretech client required temporary deluge cover for an unprotected area of offloading jetty during a planned hot work operation in the Firth and Forth.
A Hiretech client required to deploy 350ft of 2” Black Eagle hose in a Zone 2 drill floor area for a wellhead workover.
Hiretech recently supported a client’s prototype tool testing operation through the provision of pumping rental equipment.
Hiretech Limited recently undertook an important pumping trial/tool test for an established oil and gas service company.
Jim McGregor, Project Manager at Hiretech, has recently been overseas in North Africa completing well injectivity tests and client training on a Hiretech Zone 2 well service pumping package.
Hiretech has recently assisted a client to successfully complete a Plugging & Abandonment (P&A) project in the UKCS, having assisted with a similar project in Norway earlier in the year.
Two Hiretech triplex pumps were recently modified to complete an offshore xylene pumping operation.
Hiretech has been supporting a number of client decommissioning work scopes throughout the summer period.
Hiretech recently mobilised it's Solids Recovery System to assist our client in the unblocking of a subsea flowline.
We recently provided a Zone 2 Firewater Pump and experienced technicians to assist RigDeluge with one of their rig cooling projects.