Hiretech recently supported a client’s prototype tool testing operation through the provision of the firms pumping capabilities.
A Hiretech self priming lifting pump was used to lift seawater out of the sea on to the harbour pier, a lift of 7 metres at low tide. The water pressure was then boosted using a second pump prior to powering the client’s prototype tool.
Hiretech supplied all the pumps, hoses and fittings for the job and coordinated installation and training.
The job was successfully completed.